Hi everyone,
I looked for this but did not find anything, apologies if I have missed it.
We would like to use checklists for our Instructional Designers to use as they work through a project.
The idea is, have groups in the checklist, then instructional designer can tick as they work through it, and submit a group at a time to the direct manager.
Is this possible, or can only submit the whole checklist?
Thank you in advance.